1. Marion Christian Church spent 4+ weekends working on the remodeling
cabin 1's bathroom. Due to a hot water heater needing to be replaced and
new codes we had to totally redesign the bathrooms into one beautiful
bathroom...

2. First Christian Church, Newton IA added phase 2 to the Cardinal Suite by
adding new lights and a drop ceiling.

3. The plan for Chi Rho Rustic Area this Summer is to add roofs over the
table areas in the villages... They are slowly coming together....

4. Camp 15 added a new path around our pond and added new benches along the
shore for fishing or just a little reflection

5. We really were not thinking we would be doing anything to the retreat
house this Summer but thanks to heavy amounts of ground water the lower
section received about an inch of water. So a remodeling plan for the fall
got moved up to now...

Thanks for all your support and our prayers go out to all who have and are
affected by the flood of 2008

See these changes at ....
http://www.uppermidwestcc.org/FormsBrochures/CCC/2008%20ccc%20updates/FrameSet.htm

BSD
Bill Spangler-Dunning

No comments: